| The workers started early in the rain. |
| Backfilling and gravel are essential when using this block. We also used some drainage tile to ensure dryness. |
| Some tuck pointing was needed on the foundation after we tore out the old retaining wall. |
| These guys did all the work. We contacted 5 companies, 2 called us back and only 1 gave us an estimate. This guy showed up every day 45 minutes early and finished the job a day early. Believe me good contractors are hard to find and this guy is great! Check them out HERE. |
| After much debate between Sybil and I, went with the Limestone colored stone. Finished product! |
| Some back filling will be added to cover the backside of the stone. |
| The small cut out in the wall to the right of the stairs is connected to a length of drain tile. An herb garden and landscaping are our spring projects! |
| Outdoor hurricanes will eventually line the right side of the stairs. |
![]() |
| Jeff did a great job of marrying our concrete work with his stone work. |
| A last minute addition was to build this wall to seat height. |
| Now we just need a fire pit and bring on the smores! |