| The work started early in the morning at 6am. It was going to be 100+ degrees this day, so it was essential we got after it early. |
| The framing and final steps to prepare the space for the concrete were finished the night before around 10:30 - my 7month pregnant wife was even out there late raking gravel. |
| Conduit runs underneath the concrete, this will allow us to have an electric outlet. |
| Here comes the concrete, no turning back now. The concrete was stained with color of our choice. The color is a powder that is added at the concrete plant. |
| The concrete truck could only reach the steps, so we used these Georgia Buggies to haul the rest. |
| They were a bit tricky to drive but we got the hang of it. |
| The workers quickly smoothed the concrete like icing on enormous sheet cakes one might see on some Food Network Challenge |
| We applied a mixture of dish soap and water to the walls on windows of the nearby structures - this makes it much easier to clean the surfaces once the concrete dries. |
| Once the concrete sured up and achieved the proper consistency we applied the stamps "English Cobblestone". The stamps are heavy, rubber that interlock. |
![]() |
| A release agent was applied to the stamps, it also added an accent color to the pattern. |
| We applied a different pattern called "Old Granite" to the steps |
| The workers were effortless and made the concrete beautifully smooth. |
| The workers convening on the porch for an after work lunch and beer. The guys worked hard and efficient. |
| Mark said concrete does two things, it hardens and it cracks - so it is important to cut it and tell it where to crack. He used a walk behind saw to cut a few lines into the concrete |
| This will not be the final color of the surface, that will be revealed once the concrete is sealed. |
| A detailed look of the pattern on the steps |
| We plan to use stone to build up the flower box the will be centered in the patio |
| The half circle will host stone a fire pit. |